GOLD PRODUCTION
October 2026
Brendan Tritton
Managing Director & CEO
Funded. Executing. Growing.
ASX:VAL
FAST TRACK TO
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
2
Important Notes & Disclaimer
This presentation has been prepared by Valiant Gold Limited (ACN 691 820 532) (Valiant or the Company) for
the purpose of providing a general corporate update in relation to the Company, its projects and activities. The
information contained in this presentation is current as at the date of this presentation unless otherwise stated.
This presentation contains summary information only and does not purport to be complete. It should be read in
conjunction with Valiant's periodic and continuous disclosure announcements lodged with the Australian
Securities Exchange (ASX), which are available at www.asx.com.au and on the Company's website at
www.valiantgold.com.au.
Not an Offer or Investment Advice
This presentation is for information purposes only and is not a prospectus, product disclosure statement or other
disclosure document under the Corporations Act 2001 (Cth). This presentation does not constitute, and should
not be considered as, an offer, invitation, solicitation or recommendation to subscribe for, purchase or sell any
securities in Valiant.
This presentation does not constitute financial product advice or investment advice and has been prepared
without taking into account any recipient's investment objectives, financial circumstances or particular needs.
Recipients should make their own independent assessment of the information contained in this presentation and
seek their own professional advice before making any investment decision.
Forward-Looking Statements
This presentation may contain forward-looking statements, including statements regarding Valiant's strategy,
exploration and development plans, production pathway, project studies, Mineral Resource growth potential,
timing of activities, future production potential, funding position and other future matters. Forward-looking
statements are based on the Company's current expectations, assumptions and estimates as at the date of this
presentation and are subject to known and unknown risks, uncertainties and other factors, many of which are
beyond the control of Valiant.
Actual results, performance or achievements may differ materially from those expressed or implied by forward-
looking statements. These risks and uncertainties include, but are not limited to, commodity price movements,
foreign exchange fluctuations, changes in market conditions, exploration and development risks, operational
risks, environmental risks, permitting and approval risks, financing risks, cost escalation, regulatory changes and
general economic conditions.
Recipients are cautioned not to place undue reliance on forward-looking statements. Subject to any continuing
obligations under applicable law or the ASX Listing Rules, Valiant does not undertake any obligation to update or
revise any forward-looking statements, whether as a result of new information, future events or otherwise.
Mineral Resources and Exploration Results
The information in this presentation relating to Mineral Resources and exploration results has been prepared and
reported in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (JORC Code), where applicable.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the relevant previous announcements and that all material assumptions and technical parameters
underpinning the Mineral Resource estimates continue to apply and have not materially changed.
The information in this presentation that relates to the estimation and reporting of Mineral Resources at the
Reedy Project and Comet Project is based on information compiled by Ms Jill Irvin, BSc, a Competent Person
who is a current Member of the Australian Institute of Geoscientists (MAIG 3035) and Registered Professional
Geoscientist (RPGeo 10324). Ms Irvin is Principal Geologist at Entech Pty Ltd and is an independent consultant
to Valiant. Ms Irvin has sufficient experience relevant to the style of mineralisation and deposit type under
consideration and to the activities being undertaken to qualify as a Competent Person as defined in the JORC
Code. Ms Irvin consents to the inclusion in this presentation of the matters based on her information in the form
and context in which they appear.
The information in this presentation that relates to exploration matters and activities is compiled by Mr Lieth de
Selincourt, MSc, who is a Member of the Australian Institute of Geoscientists (MAIG 6123) and Society of
Economic Geologists (MSEG 915908) and has verified, reviewed and approved such information. Mr de
Selincourt has sufficient experience relevant to the styles of mineralisation and types of deposits under
consideration and to the activities being undertaken to qualify as a Competent Person as defined in the JORC
Code. Mr de Selincourt is the Manager Exploration of Valiant and is therefore not independent. Mr de Selincourt
consents to the inclusion in this presentation of the matters based on his information in the form and context in
which they appear.
Disclaimer
To the maximum extent permitted by law, Valiant, its related bodies corporate, and their respective directors,
officers, employees, advisers and agents make no representation or warranty, express or implied, as to the
accuracy, reliability, completeness or fairness of the information, opinions, forecasts, estimates or conclusions
contained in this presentation.
To the maximum extent permitted by law, Valiant and its related bodies corporate, and their respective directors,
officers, employees, advisers and agents expressly disclaim any and all liability, including liability arising from
fault or negligence, for any direct, indirect, consequential or contingent loss or damage arising from the use of, or
reliance on, any information contained in this presentation.
The information in this presentation remains subject to change without notice. Statements in this presentation
are made only as at the date of this presentation unless otherwise stated.
Rounding
Some figures, amounts, percentages, estimates, calculations of value and fractions in this presentation are
subject to rounding. Accordingly, totals may not add due to rounding.
This presentation has been authorised for release by the Board of Valiant Gold Limited.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
3
Corporate Overview
FUNDED RESTART. SUPPORTIVE REGISTER.
SIGNIFICANT OWNERSHIP¹ CAPITALISATION²
Westgold Resources 44.4%
Franklin Resources 5.1%
Pendal Group 3.5%
Milford Asset Management 3.2%
Spheria Asset Management 2.5%
Renaissance Smaller Companies 2.3%
Ryder Investment Management 2.0%
Westgold holding via Big Bell Gold Operations.
Shares on issue 540.0m Share price $0.245
Market cap $132.3m
Cash¹ $62.5m
Enterprise value $69.8m
SHARE PRICE SINCE LISTING4
1.2Moz Resource base | H2 FY27 Comet first production targeted³ | A$58/oz EV per Resource ounce²
¹ Nasdaq 30 Sep 2026; cash from September Quarterly Report. ² A$0.245/share basis, EV assumes no debt. ³ Target subject to execution. Chart to 23 Oct 2026. 4Source: Australian Securities Exchange
EV/Oz $58/oz
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
4
Board & Management
Derek La Ferla
Non-Executive Chairman
Derek is an experienced Chair
and Company Director having
served on several ASX 200,
small market cap and private
company boards. His
background is as a corporate
lawyer and a partner in several
international and local law firms.
In addition to the Company,
Derek is chair of Chalice Mining
Limited (ASX:CHN), Icon
Engineering Pty Ltd, Training
and Alliance Group Pty Ltd and
Foodbank WA. He is also a
partner at Western Australian law
firm, Lavan.
Derek is the former chair of
Sandfire Resources Limited and
a former board member of the
Australian Institute of Company
Directors.
Brendan Tritton
Managing Director &
Chief Executive Officer
Simon Rigby
Non-Executive Director
Anthony Chamberlain
Non-Executive Director
Donna Thornton
Chief Financial Officer
Brendan is an accomplished
mining executive and engineer
with extensive experience
spanning technical operations,
corporate strategy and leadership.
A graduate of the Western
Australian School of Mines
(WASM), he combines deep
technical foundations with strong
commercial and organisational
insight.
Brendan has held senior
operational and leadership roles
across multiple projects including
Barrick’s Kanowna Belle and
Mincor Resources NL’s Kambalda
operations.
Brendan holds a degree in Mining
Science from WASM and plays a
leadership role within the alumni.
Simon is a Geologist (BSc
(Hons), MAIG) with more than
35 years of experience in
mineral exploration, mining,
business development and
executive leadership within
both major and junior
companies. He has worked in
precious and base metals and
strategic minerals throughout
Australasia, Africa, Europe and
the Americas.
Simon is the Chief Growth
Officer of Westgold and was
appointed as Westgold's
nominee on the Board.
Tony holds a PhD in metallurgy
from Curtin University and is an
experienced mining executive
with over 30 years’ experience in
resources. Tony brings a wealth
of knowledge in project
development from resource
optimisation, engineering,
approvals, construction and
management.
Tony has held senior operational
and management roles during
his 12 years at WMC Resources
and BHP. Additionally, he has
served in senior and executive
positions at several ASX-listed
junior resource companies,
including Vimy Resources, BCI
Minerals, Clean TeQ,
Stonehenge Metals, and
Crossland Strategic Metals.
Joan Dabon
Company Secretary
Joan is a Chartered Secretary
with over nine years’
experience in company
secretarial and corporate
advisory services, supporting
ASX and NSX listed
companies across a wide
range of sectors including
mining & oil and gas,
manufacturing, automotive,
technology, renewable energy,
logistics, and distribution. She
was the Executive Director –
Governance (West Coast) at
Source Governance, where
she led the governance
delivery and strategic board
support for a diverse client
base.
Joan holds a Juris Doctor
degree and is an Associate
Member of the Governance
Institute of Australia.
Donna brings more than 25
years of leadership experience
across the resources and
contract mining sectors, most
recently serving as Chief
Financial Officer for ASX listed
gold producer Catalyst Metals.
A chartered accountant and
accomplished financial
executive, Donna has held
senior roles with Catalyst
Metals, Alkane Resources,
Consolidated Minerals and
Macmahon, where she
delivered strategic commercial
insight.
Her deep expertise in the gold
industry, combined with her
extensive operational and
corporate experience, will be
instrumental in advancing
Valiant's growth strategy.
A Board and management team with the operational, technical, financial
and governance experience required to advance mine restart and
resource growth programs in Western Australia.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
5
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026,
as amended by the Supplementary Prospectus dated 20 February 2026, (together, the Prospectus) for further information
regarding the Mineral Resource Estimates and historical production information.
BROWNFIELDS EXECUTION ADVANTAGE
Existing Mining Leases, underground access and
regional infrastructure support a staged restart
pathway
Funded Pathway to Production and Resource Growth
FUNDED TO ADVANCE COMET RESTART
$62.5m cash at 30 September 2026, with no debt
ACCELERATED PROCESSING PATHWAY
Ore Purchase Agreement with Westgold
Resources (ASX WGX) provides access to nearby
processing infrastructure
ESTABLISHED 1.2MOZ RESOURCE BASE
15.6Mt at 2.4g/t Au for 1.2Moz, including 465koz
in Measured and Indicated categories
Murchison, Western Australia
Comet and Reedy are located near established regional processing infrastructure
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
6
100%-owned brownfields gold project
Last operated by Westgold in FY23
Existing Mining Leases and underground
development
14km by road from the Tuckabianna Mill
Ore Purchase Agreement provides an established
processing pathway
First production targeted for H2 FY27
Mineralisation remains open with further mine-life
extension potential
Comet
The First Restart
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the
Supplementary Prospectus dated 20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and
historical production information..
Comet mine-trend Mineral Resource
supporting the underground restart
Total Comet Project MRE: 4.1Mt at 2.43g/t Au for 319koz
304koz – 2.51 g/t Au
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
7
Permanent power and
pumping commissioned
Restart Study and
preliminary mining
schedule completed
Mining and drilling
contractors mobilised
Grade-control and
Resource-definition
drilling commenced
Dewatering and
rehabilitation advanced
to production areas
First production targeted
for H2 FY27
Comet Restart
Key Steps to First Production
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the Supplementary Prospectus dated
20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and historical production information.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
8
Multiple targets remain to be tested along
the established Comet–Pinnacles mine
trend.
Down-dip extensions below Comet
and Pinnacles
Southern extension of the Pinnacles
trend
Comet–Comet North gap
Intersection of the Comet and
Pinnacles trends
Potential additional lodes along the
mineralised corridor
Comet
Near-Mine Resource
Growth Targets
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the Supplementary Prospectus dated 20 February
2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and historical production information..
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
9
890koz Brownfields Platform with Two Development
Pathways
South Emu–Triton: high-grade future underground restart
opportunity (Last operated in FY23)
Boomerang: open-pit and underground growth opportunity
Existing workings and Mining Leases support brownfields
development
Active drilling targeting Resource confidence and growth
Processing access under the Westgold Ore Purchase
Agreement
Reedy
The Next Development
Opportunity
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the
Supplementary Prospectus dated 20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and
historical production information.
11.5Mt @ 2.4g/t Au
890koz Resource Base
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
10
Reedy
South Emu - Triton
224koz High-grade
Resource
Future underground restart opportunity
1.7Mt at 4.0g/t Au
Dewatering planning to commence in Q2 FY27
Mine engineering and dewatering studies
planned
Existing underground workings provide a
brownfields foundation
Recent drilling provides new data for future
mine planning
Further drilling being assessed from a closer
underground position
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the Supplementary
Prospectus dated 20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and historical production information.
2. Refer to the Company’s Announcement dated 16 June 2026 titled ‘Mineralisation Extensions Confirmed at South-Emu Triton’ for exploration results from 26REDD001_W1, W5.
3. Refer to the Company’s Announcement dated 31 August 2026 titled ‘South Emu – Triton Drilling Continues to Return Strong Results ’ for exploration results from 26REDD003.
4. Refer to the Company’s Announcement dated 30 April 2026 titled ‘Quarterly Activities & Cashflow Reports’ for South Emu – Triton historic exploration results.
5. Refer to the Company’s Announcement dated 26 October 2026 titled ‘Quarterly Activities Reports’ for exploration results from 26REDD004.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
11
Drilling Strengthens the Future Restart Case
Maiden drilling confirms mineralisation below
the existing Resource
Mineralisation extends up to approximately
400m below the MRE
System remains open down-dip and along
strike
Results support future Resource evaluation and
mine planning
Further drilling being assessed from a closer
underground position
Building The Restart Case
High-grade results below the existing
Resource support further technical
evaluation
Reedy
South Emu - Triton
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the Supplementary Prospectus dated
20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and historical production information.
2. Refer to the Company’s Announcement dated 16 June 2026 titled ‘Mineralisation Extensions Confirmed at South-Emu Triton’ for exploration results from 26REDD001_W1, W5
4. Refer to the Company’s Announcement dated 30 April 2026 titled ‘Quarterly Activities & Cashflow Reports’ for South Emu – Triton historic exploration results.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
12
A Large Resource with Multiple
Development Pathways
Largest single Resource within the Reedy
Project
367koz existing open-pit and underground MRE
Granted Mining Lease and existing workings
Potential open-pit and future underground
scenarios under evaluation
45km by road from accessible processing
infrastructure
Resource-growth planning underway
5.26Mt @ 2.17g/t Au
367koz Resource Base
Reedy
Boomerang
6. Refer to the Company’s Announcement dated 28 October 2026 titled ‘First Boomerang Drilling Results Return Multiple High-Grade Gold Intercepts’’ for Boomerang exploration
results
1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the Supplementary Prospectus dated
20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and historical production information.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
13
Drilling Builds a Development Case
Significant intercepts within the existing Resource
footprint support an extended drill program
Results support interpreted continuity and build
Resource confidence
Phase two targets a potential cut-back of the
Boomerang open pit
Follow-up drilling to extend the underground
resource; further growth targets under
assessment
Additional drilling to underpin pit optimisation and
cut-back scenarios
Reedy
Boomerang
Building Resource Confidence
Drilling data to inform potential
development scenarios 1. Refer to the "Important Notes and Disclaimer" on slides 2 Presentation and the Company’s Prospectus dated 16 February 2026, as amended by the Supplementary
Prospectus dated 20 February 2026, (together, the Prospectus) for further information regarding the Mineral Resource Estimates and historical production information.
6. Refer to the Company’s Announcement dated 28 October 2026 titled ‘First Boomerang Drilling Results Return Multiple High-Grade Gold Intercepts’’ for Boomerang
exploration results
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
14
15–50KT PER MONTH
Defined ore delivery range, subject to OPA
conditions.
PROCESSING PATHWAY
Access to established Westgold processing
infrastructure.
LOWER CAPITAL PATHWAY
No standalone processing plant required.
Ore Purchase Agreement
Capital-Efficient Pathway to Production
PORTFOLIO FLEXIBILITY
Supports Comet and future development
opportunities.
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
15
Execution Roadmap
Comet restart and portfolio growth program
Reedy Comet
ACTIVITY / DELIVERABLE
FY27 FY28
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Dewatering commenced
Reedy definition, extension and growth drilling
Comet definition, extension and growth drilling
South Emu - Triton Dewatering
Comet Camp / site infrastructure works
Comet underground LOM design & schedule
Comet mining contractor selection
Mining contract award & site mobilisation
Comet and Pinnacles Underground dewatering
Pinnacles underground development
Comet underground development
First ore / stope production
FY27: Jul 2026–Jun 2027 FY28: Jul 2027–Jun 2028 Indicative timing only
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
16
Why Valiant?
RESOURCE SCALE AND GROWTH
1.2Moz Resource base with multiple
development and growth opportunities.
Funded Restart | Established Resource | Multiple Growth Pathways
BROWNFIELDS ADVANTAGE
Existing Mining Leases, underground
development and infrastructure.
CAPITAL-EFFICIENT PROCESSING
Established processing pathway with no
standalone plant required.
FUNDED PATHWAY TO PRODUCTION
Comet funded to first production, targeted
for H2 FY27.
Near-Term Execution | Lower-Capital Pathway | Established Resource | Portfolio Optionality
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
17
Investor Contact
Stay Connected
Contact Valiant to arrange a meeting or request further information.
Brendan Tritton
Managing Director & CEO, Valiant Gold
(08) 6373 8900 communications@valiantgold.com.au
www.valiantgold.com.au
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
18
Appendix
Reference Materials
Valiant
Gold
|
Investor
Presentation
October
2026
ASX:
VAL
19
Measured Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Comet
Comet 151,971 3.54 17,296 248,294 3.63 28,978 262,580 2.99 25,242 662,845 3.35 71,392
Comet North (OP) - - - 433,822 2.47 34,451 160,809 2.06 10,650 594,631 2.36 45,118
Comet North (UG) - - - 19,093 3.44 2,112 269,013 2.31 19,979 288,106 2.39 22,138
Pinnacles 84,012 2.22 5,996 1,189,880 2.28 87,223 955,172 2.34 71,860 2,229,064 2.31 165,549
Venus / Mercury - - - 249,588 1.5 12,037 50,769 1.67 2,726 300,357 1.53 14,775
Total 235,983 3.07 23,293 2,140,677 2.39 164,799 1,698,343 2.39 130,458 4,075,003 2.43 318,971
Reedy
Boomerang - Kurara (OP) - - 292,071 0.91 8,536 1,711,352 1.50 82,312 2,003,423 1.41 90,847
Boomerang - Kurara (UG) - - 472,059 4.31 65,383 2,788,285 2.35 210,846 3,260,344 2.64 276,229
Calisto 1,112 2.21 79 147,196 2.31 10,932 29,863 1.21 1,162 178,170 2.13 12,173
Culculli - - - 76,092 1.23 3,009 185,572 1.48 8,830 261,664 1.41 11,839
Jack Ryan (UG) - - - 203,537 1.72 11,255 347,925 2.02 22,596 551,462 1.91 33,851
Midway - - - 42,828 1.39 1,914 9,273 1.11 331 52,101 1.34 2,245
Missing Link - - - 30,771 1.19 1,177 38,733 1.87 2,329 69,504 1.57 3,506
Rand (OP) - - - 662,275 1.43 30,448 556,841 2.5 44,757 1,219,116 1.92 75,255
Rand (UG) - - - 182,623 2.01 11,802 1,452,754 2.59 120,971 1,635,377 2.53 133,024
RL9 - - - 24,946 2.91 2,331 17,545 2.19 1,237 42,491 2.61 3,568
South Emu (UG) 16,815 3.61 1,952 676,953 3.78 82,161 725,403 4.47 104,227 1,419,172 4.13 188,350
Triton (UG) 46,690 3.31 4,967 244,799 3.86 30,411 4,694 3.17 478 296,183 3.77 35,862
Thompson's Bore - - - 98,741 1.61 5,111 98,741 1.61 5,111
Turn of the Tide - - - 265,542 1.32 11,269 151,032 1.17 5,681 416,574 1.27 17,009
West Zone - - - - - - 15,598 1.38 692 15,598 1.38 692
Total 64,617 3.37 6,998 3,321,692 2.53 270,629 8,133,611 2.34 611,559 11,519,920 2.4 889,561
Combined Total 300,600 3.13 30,291 5,462,369 2.48 435,428 9,831,954 2.35 742,017 15,594,923 2.41 1,208,532
Appendix 1
Mineral Resource Estimate
COMPETENT PERSONS STATEMENT
The information in this Presentation to which this statement is attached that relates to the Estimation and Reporting of Mineral Resources at the Reedy Project and Comet Project is based on information compiled by Ms Jill Irvin, BSc, a
Competent Person who is a current Member of the Australian Institute of Geoscientists (MAIG 3035) and Registered Professional Geoscientist (RPGeo 10324). Ms Irvin, Principal Geologist at Entech Pty Ltd, is an independent consultant to
Valiant with sufficient experience relevant to the style of mineralisation and deposit type under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ms Irvin consents to the inclusion in this Presentation of matters based on her information, in the form and context in which it appears.
Share your feedback
Discover