Boomerang Drill Results Return High-Grade Gold Intercepts
Released
Released
Announcement PDF
Valiant Gold Limited (ACN 691 820 532)
A: Ground Floor, 34 Colin Street West Perth WA 6005 | W: www.valiantgold.com.au
ASX ANNOUNCEMENT
28 October 2026
FIRST BOOMERANG DRILLING RESULTS
RETURN MULTIPLE HIGH-GRADE GOLD
INTERCEPTS
Valiant Gold Limited (ASX: VAL) (Valiant or the Company) is pleased to report initial assay results
from the ongoing diamond drilling program at the Boomerang gold deposit, part of its 100%-
owned Reedy Gold Project in Western Australia. All five holes returned multiple significant gold
intercepts, including high-grade results supporting the interpreted continuity of mineralisation
within the existing Mineral Resource footprint.
Key Highlights
Assays results for the first five diamond holes drilled at Boomerang have returned multiple
significant gold intercepts
Targeted mineralised lodes were broadly intersected in the expected positions, supporting the
geological interpretation within the existing Mineral Resource footprint
Standout intersections include:
• 6.0m @ 5.70g/t Au from 469.0m (26BMDD001)
• 6.8m @ 4.35g/t Au from 423.5m; incl. 4.0m @ 6.40g/t Au (26BMDD002)
• 4.1m @ 7.93g/t Au from 287.4m (26BMDD003)
• 3.6m @ 6.36g/t Au from 407.8m; incl. 1.2m @ 12.51g/t Au (26BMDD003)
• 6.0m @ 5.01g/t Au from 346.0m (26BMDD004)
• 9.3m @ 3.05g/t Au from 333.6m; incl. 0.3m @ 52.90g/t Au (26BMDD005)
• 8.0m @ 2.99g/t Au from 363.4m; incl. 0.9m @ 21.20g/t Au (26BMDD005)
• 7.1m @ 3.18g/t Au from 389.0m; incl. 0.5m @ 29.20g/t Au (26BMDD005)
Drilling of the current 8,000m program continues with two diamond rigs in operation, with
further assays pending
Management Comments
“These are highly encouraging first results from Boomerang, with multiple high-grade gold intercepts
demonstrating strong continuity in both grade and mineralised thickness across the deposit. Importantly,
the results align well with the existing geological interpretation and provide further confidence in the
continuity of the mineralised lodes within the current Mineral Resource Estimate (MRE). These results will
support evaluation of a potential accelerated open-pit opportunity and future underground mining
scenarios. With drilling continuing and further assays pending, these early results reinforce the quality of
the Boomerang deposit and its potential to support Valiant’s broader development strategy at the Reedy
Gold Project.” - Brendan Tritton, Managing Director & CEO
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 2
Boomerang Gold Deposit Overview
The Boomerang gold deposit is located at the northern end of the Reedy Project, approximately
45km by road from Westgold’s Bluebird Mill and only ~80 km by road from the town of
Meekatharra.
Figure 1: Reedy Project and Boomerang gold deposit location, showing proximity to processing infrastructure accessible
under the Ore Purchase Agreement with Westgold Resources Limited. ¹
Boomerang hosts an existing MRE of 5.26Mt @ 2.17g/t Au for 367koz of gold¹. The deposit
comprises three historic open pits over an approximate 1.25km strike length and one underground
mine (Figure 3, Figure 2).
Gold mineralisation at Boomerang is developed within a structurally controlled, shear-hosted
system comprising variably dipping mineralised lodes. A shallow laterite-hosted gold component is
developed locally above the primary system, reflecting residual enrichment spatially associated with
the underlying shear zones. Mineralisation remains open both at depth and along strike, most
notably to the north of the underground workings and below the historic Kurara pits, where there
has been limited drilling below 150m over 600m of strike (Figure 3).
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 3
Boomerang Initial Assay Results
The maiden drill program at Boomerang (designated Phase A) is planned to comprise approximately
8,000m of diamond drilling, which was designed to increase geological confidence in the existing
MRE and provide information to support evaluation of a potential accelerated open-pit
development opportunity and future underground mining scenarios.
Assay results have been received from the first five drill holes, 26BMDD001 to 26BMDD005 (Figure
2), and are reported in this announcement. These holes targeted the Indicated Mineral Resource
footprint and the transition into the Inferred Mineral Resource below the historical underground
workings at Boomerang (Figure 3).
First results from Boomerang are considered highly encouraging, returning multiple high-grade
gold intercepts, including:
• 6.0m @ 5.70g/t Au from 469.0m (26BMDD001)
• 6.8m @ 4.35g/t Au from 423.5m; incl. 4.0m @ 6.40g/t Au (26BMDD002)
• 4.1m @ 7.93g/t Au from 287.4m (26BMDD003)
• 3.6m @ 6.36g/t Au from 407.8m; incl. 1.2m @ 12.51g/t Au (26BMDD003)
• 6.0m @ 5.01g/t Au from 346.0m (26BMDD004)
• 9.3m @ 3.05g/t Au from 333.6m; incl. 0.3m @ 52.90g/t Au (26BMDD005)
• 8.0m @ 2.99g/t Au from 363.4m; incl. 0.9m @ 21.20g/t Au (26BMDD005)
• 7.1m @ 3.18g/t Au from 389.0m; incl. 0.5m @ 29.20g/t Au (26BMDD005)
Refer to Appendix B for full table of significant intercepts.
All five drill holes have returned multiple significant intercepts, consistent with the interpretation of
multiple stacked steeply westerly dipping lodes. The targeted mineralised lodes were broadly
intersected in the expected positions, providing additional confidence and validation on the
continuity, geometry and grade distribution of mineralisation within the existing MRE (Figure 4,
Figure 5).
The results received to date provide additional geological confidence in the Indicated and Inferred
Mineral Resource of 5.26Mt @ 2.17g/t Au for 367koz of gold1
. Additional exploration has the
potential to expand the MRE with the system remaining open along strike and at depth.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 4
Figure 2: Boomerang Plan view map, displaying MRE Outline1
, historical drilling, Boomerang and Kurara pits and Valiant
recent drill traces. Presented schematic long section and cross section location is labelled.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 5
Technical Interpretation
The Boomerang stratigraphic sequence dips steeply west to subvertical and comprises hanging-wall
mafic volcanic rocks interbedded with banded iron formation, a central serpentinised ultramafic unit
and footwall mafic volcanic rocks, on which the Reedy shear zone is centred (Figure 4, Figure 5 ).
Mineralisation is characterised by variably developed quartz–carbonate–pyrite vein breccias
associated with carbonate–sericite–albite–silica alteration. It is generally concentrated along the
hanging-wall and footwall contacts of the central ultramafic unit, with mineralised structures locally
continuing into the footwall mafic sequence. Additional footwall lodes are interpreted as a potential
exploration opportunity, but remain largely untested.
Figure 3: Boomerang Schematic Long Section (facing west) displaying Mineral Resource inventory (MRE)1 with ounce per
vertical metre breakdown, previously mined volumes and Valiant Gold drilling Gram.Metres intersections (>5).
Drilling continues using two diamond rigs, and approximately half of the planned metres for the
program have been completed. Further drilling will focus on the area beneath the northern extent
of the Kurara Pit and within the saddle area of the Boomerang Pit, targeting the Inferred resource.
Assay results will be reported as they are received, reviewed and validated.
Refer to Appendix C - JORC Table 1 for relevant information concerning details of sampling
techniques, drilling methods and data quality of Valiant exploration results reported in this
announcement. For the collar locations and significant intercepts reported in this announcement,
refer to Appendices A and B, respectively.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 6
Figure 4: Boomerang Schematic Cross Section 50100N (local grid), displaying historic underground mine, previous2
and
Valiant drill hole (26BMDD003), significant intercepts, MRE Outline1
and the targeted Reedy Shear Zone.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 7
Figure 5: Boomerang Schematic Cross Section 50225N (local grid), displaying historic underground mine, previous2
and
Valiant drill hole (26BMDD005), significant intercepts, MRE Outline1
and the targeted Reedy Shear Zone.
The Boomerang project is situated on a granted Mining Lease approximately 45km by road from
processing infrastructure accessible under the Ore Purchase Agreement with Westgold Resources
Limited. The project complements Valiant’s advancing Comet restart and the planned future restart
at South Emu–Triton.
Boomerang Next Steps
Next steps targeted for Q2 FY27 include:
Continue the Phase A diamond drilling program with 2 Diamond Rigs;
Receive, review and validate pending assays;
Update the geological interpretation as results become available;
Refine follow-up drilling priorities for Phase B
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 8
Comet Mine Restart Activities
Next steps targeted for Q2 FY27 at Comet include:
Appointment of the underground mining services contractor
Delivery and mobilisation of the initial 30-person accommodation camp
Appointment and mobilisation of the underground drilling contractor
Commencement of priority grade-control and resource-definition drilling at Comet
References
Further information on the exploration results referenced in this announcement, including the
applicable JORC disclosures, is available in the following ASX announcements:
1. 16 Feb 2026 - Company’s Prospectus dated 16 February 2026, as amended by the
Supplementary Prospectus dated 20 February 2026 (together, the Prospectus) for further
information regarding the Mineral Resource Estimates.
2. 16 Jul 2026 - Maiden Drill Program to Commence at Boomerang Gold Deposit
Full details of these announcements can be viewed here.
Valiant’s Development Pipeline
Comet: Lead mine restart workstream, with critical infrastructure, site establishment,
dewatering, rehabilitation and technical activities advancing in parallel with completion of the
Comet Restart Study and development of the preliminary restart mining schedule.
South Emu–Triton: Future underground restart opportunity, with recent drilling advancing
mine planning and detailed dewatering preparations underway ahead of restart.
Boomerang: Potential open-pit and underground development opportunity, with Resource
definition drilling underway and Resource-growth planning in progress.
No development decision has been made in respect of Boomerang or South Emu–Triton. Any future dewatering or development decision
will remain subject to technical review, approvals, funding, sequencing and other relevant considerations.
Investor Relations
You can engage with the Company about this announcement here.
This announcement is authorised for release by the Board of Directors.
Enquiries
Brendan Tritton Investor Relations
Managing Director & CEO communications@valiantgold.com.au
info@valiantgold.com.au
+61 8 6373 8900
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 9
About Valiant Gold
Valiant Gold is a Western Australian gold company advancing a fully funded mine restart in the
Murchison region. Demerged from Westgold Resources and listed in March 2026, the Company
holds 100% of the Comet and Reedy gold projects: brownfields assets on granted Mining Leases
with existing underground development, historical production exceeding 1Moz, and a combined
Mineral Resource of 1.2Moz @ 2.4g/t Au.
An Ore Purchase Agreement with Westgold Resources also secures processing capacity at the
Tuckabianna and Bluebird mills, removing the requirement to construct a standalone plant thus
establishing a lower-capital pathway to production, targeted for H2 FY27.
With existing Mining Leases, a near-term pathway to production, a processing solution from day
one and a clear focus on mine restart and resource growth, Valiant is advancing toward its next
phase of development.
Current Mineral Resource Estimates1
are:
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
Comet 151,971 3.54 17,296 248,294 3.63 28,978 262,580 2.99 25,242 662,845 3.35 71,392
Comet North (OP) - - - 433,822 2.47 34,451 160,809 2.06 10,650 594,631 2.36 45,118
Comet North (UG) - - - 19,093 3.44 2,112 269,013 2.31 19,979 288,106 2.39 22,138
Pinnacles 84,012 2.22 5,996 1,189,880 2.28 87,223 955,172 2.34 71,860 2,229,064 2.31 165,549
Venus / Mercury - - - 249,588 1.5 12,037 50,769 1.67 2,726 300,357 1.53 14,775
Total 235,983 3.07 23,293 2,140,677 2.39 164,799 1,698,343 2.39 130,458 4,075,003 2.43 318,971
Boomerang - Kurara
(OP)
- -
292,071 0.91 8,536 1,711,352 1.50 82,312 2,003,423 1.41 90,847
Boomerang - Kurara
(UG)
- - 472,059 4.31 65,383 2,788,285 2.35 210,846 3,260,344 2.64 276,229
Calisto 1,112 2.21 79 147,196 2.31 10,932 29,863 1.21 1,162 178,170 2.13 12,173
Culculli - - - 76,092 1.23 3,009 185,572 1.48 8,830 261,664 1.41 11,839
Jack Ryan (UG) - - - 203,537 1.72 11,255 347,925 2.02 22,596 551,462 1.91 33,851
Midway - - - 42,828 1.39 1,914 9,273 1.11 331 52,101 1.34 2,245
Missing Link - - - 30,771 1.19 1,177 38,733 1.87 2,329 69,504 1.57 3,506
Rand (OP) - - - 662,275 1.43 30,448 556,841 2.5 44,757 1,219,116 1.92 75,255
Rand (UG) - - - 182,623 2.01 11,802 1,452,754 2.59 120,971 1,635,377 2.53 133,024
RL9 - - - 24,946 2.91 2,331 17,545 2.19 1,237 42,491 2.61 3,568
South Emu (UG) 16,815 3.61 1,952 676,953 3.78 82,161 725,403 4.47 104,227 1,419,172 4.13 188,350
Triton (UG) 46,690 3.31 4,967 244,799 3.86 30,411 4,694 3.17 478 296,183 3.77 35,862
Thompson's Bore - - - 98,741 1.61 5,111 98,741 1.61 5,111
Turn of the Tide - - - 265,542 1.32 11,269 151,032 1.17 5,681 416,574 1.27 17,009
West Zone - - - - - - 15,598 1.38 692 15,598 1.38 692
Total 64,617 3.37 6,998 3,321,692 2.53 270,629 8,133,611 2.34 611,559 11,519,920 2.4 889,561
Combined Total 300,600 3.13 30,291 5,462,369 2.48 435,428 9,831,954 2.35 742,017 15,594,923 2.41 1,208,532
Comet
Reedy
Measured Indicated Inferred Total
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 10
Competent Person’s Statement
The information regarding the Mineral Resource Estimate is extracted from Valiant Gold Limited’s
Prospectus dated 16 February 2026, as amended by the Supplementary Prospectus dated 20
February 2026 (together, the Prospectus). The Company confirms that it is not aware of any new
information or data that materially affects the information included in the Prospectus and that all
material assumptions and technical parameters underpinning the estimates in the Prospectus
continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been
materially modified from the Prospectus.
The Information in this report that relates to previously reported Exploration Results at Boomerang
has been extracted from the ASX announcements titled: “Maiden Drill Program to Commence at
Boomerang Gold Deposit” released on 16 July 2026, which are available at www.valiantgold.com.au.
Exploration results are reported at Boomerang in this announcement. The information in this
announcement that relates to Exploration matters and activities is compiled by Mr Lieth de
Selincourt M.Sc., who is a member of the Australian Institute of Geoscientists (MAIG 6123) and
Society of Economic Geologists (MSEG 915908) has verified, reviewed, and approved such
information. Mr de Selincourt has sufficient experience which is relevant to the styles of
mineralisation and types of deposit under consideration and to the activities which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Mr de
Selincourt is the Manager Exploration of Valiant Gold Limited and accordingly is not independent.
Mr de Selincourt consents to and approves the inclusion in this announcement of the matters based
on his information in the form and context in which it appears. Mr de Selincourt is eligible
to participate in incentive plans of Valiant Gold Limited.
Forward Looking Statements
This announcement includes various ‘forward-looking statements’ with respect to, among other
things, goals, plans, and strategies. Such forward-looking statements are not guarantees of future
performance and involve known and unknown risks, uncertainties and other factors beyond the
control of the Company that may cause the actual results, performance and outcomes to be
materially different from those expressed or implied by such statements. Forward-looking
statements are provided as a general guide only, and should not be relied on as an indication or
guarantee of future performance. Given these uncertainties, recipients are cautioned to not place
undue reliance on any forward-looking statement. Subject to any continuing obligations under
applicable law, the Company disclaims any obligation or undertaking to disseminate any updates
or revisions to any forward-looking statements in this announcement to reflect any change in
expectations in relation to any forward-looking statements or any change in events, conditions or
circumstances on which any such statement is based.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 11
Appendix A - Boomerang Drill Hole Collars
Hole ID
Depth
(m)
Local
East
Local
North
MGA 2020
East
MGA 2020
North Elevation Dip
Local
Azimuth
Grid
Azimuth
26BMDD001 649.2 20302 50305 627530 7008079 458 -70 83 92
26BMDD002 642.5 20309 50188 627520 7007962 457 -64 93 102
26BMDD003 492.3 20379 50139 627581 7007903 457 -62 101 110
26BMDD004 436.1 20302 50305 627530 7008079 458 -61 75 70
26BMDD005 462.0 20360 50238 627577 7008003 460 -63 79 101
• Coordinates and azimuths are reported in the Reedy 2014 local grid and MGA 2020 Zone 50 grid.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 12
Appendix B - Boomerang Significant Intercepts
Hole ID Depth From Depth To Interval (m) Au (g/t) Gram.Metre Au
26BMDD001 156.0 157.0 1.0 0.53 0.5
26BMDD001 436.0 440.1 4.1 2.29 9.3
26BMDD001 454.4 458.0 3.6 2.08 7.5
26BMDD001 463.7 466.0 2.3 1.64 3.8
26BMDD001 469.0 475.0 6.0 5.70 34.2
26BMDD001 493.0 498.0 5.0 0.65 3.2
26BMDD001 510.0 516.6 6.6 2.06 13.7
26BMDD001 557.5 561.6 4.2 1.38 5.7
26BMDD001 576.5 579.2 2.7 1.34 3.6
26BMDD001 592.0 593.2 1.2 2.94 3.5
26BMDD001 620.0 622.8 2.8 1.51 4.2
26BMDD002 154.0 155.0 1.0 0.80 0.8
26BMDD002 180.0 181.0 1.0 3.23 3.2
26BMDD002 204.0 205.0 1.0 0.56 0.6
26BMDD002 384.0 385.0 1.0 0.69 0.7
26BMDD002 388.3 390.0 1.7 2.86 4.9
26BMDD002 423.5 430.3 6.8 4.35 29.6
incl. 4.0 6.40
26BMDD002 439.0 442.0 3.0 0.92 2.8
26BMDD002 445.0 446.0 1.0 0.64 0.6
26BMDD002 466.0 478.7 12.7 1.48 18.7
26BMDD002 492.0 493.0 1.0 1.31 1.3
26BMDD002 498.0 503.3 5.3 3.19 16.9
26BMDD002 557.0 562.0 5.0 1.48 7.4
26BMDD002 622.0 623.0 1.0 0.79 0.8
26BMDD003 92.2 94.0 1.9 1.02 1.9
26BMDD003 287.4 291.4 4.1 7.93 32.4
26BMDD003 296.7 299.1 2.4 1.53 3.7
26BMDD003 366.8 369.5 2.6 0.76 2.0
26BMDD003 373.4 374.5 1.1 1.01 1.1
26BMDD003 381.2 386.3 5.1 2.12 10.8
26BMDD003 398.8 400.7 1.9 4.10 7.9
26BMDD003 407.8 411.4 3.6 6.36 22.8
incl. 1.2 12.51
26BMDD003 434.4 436.0 1.6 0.93 1.5
26BMDD003 450.7 451.8 1.1 1.10 1.2
26BMDD003 457.4 459.6 2.2 0.61 1.3
26BMDD003 476.0 477.5 1.5 2.85 4.3
26BMDD004 204.0 205.0 1.0 1.47 1.5
26BMDD004 235.0 236.0 1.0 1.30 1.3
26BMDD004 346.0 352.0 6.0 5.01 30.1
26BMDD004 375.7 378.0 2.3 0.67 1.6
26BMDD004 401.0 405.0 4.0 2.34 9.4
26BMDD004 411.0 412.0 1.0 1.10 1.1
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 13
Hole ID Depth From Depth To Interval (m) Au (g/t) Gram.Metre Au
26BMDD005 313.7 318.8 5.1 1.00 5.1
26BMDD005 323.3 324.9 1.5 1.26 1.9
26BMDD005 333.6 342.9 9.3 3.05 28.4
incl. 0.3 52.90
26BMDD005 363.4 371.4 8.0 2.99 23.9
incl. 0.9 21.20
26BMDD005 380.0 381.0 1.0 1.80 1.8
26BMDD005 389.0 396.1 7.1 3.18 22.4
incl. 0.5 29.20
26BMDD005 399.0 402.7 3.7 0.86 3.2
26BMDD005 405.5 408.8 3.3 1.87 6.2
26BMDD005 445.0 446.0 1.0 2.22 2.2
• Intervals reported as downhole widths.
• Significant intercepts are reported using a 0.5 g/t Au lower cut-off grade, allowing for a maximum
of 2 m of continuous internal dilution. A minimum downhole interval width of ≥1 m is applied.
Intercepts with an average grade exceeding 0.5 g/t Au are reported.
• Gram.metre Au = Interval (m) x Au (g/t)
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 14
Appendix C - JORC Code (2012) Table 1
Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to
obtain 1m samples from which 3kg was
pulverised to produce a 30g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.
• Only diamond core sample results are released
in this announcement.
• The reported results include PQ, HQ and NQ
core samples.
• Diamond samples were collected from
selected intervals ranging from 0.3m to 1.5m.
• Core was sampled on geologically defined
intervals, composed of half-core.
• Sampling the same half side of the core is
conducted, where reliable orientation lines are
available. All samples were pulverised to a
nominal 80% passing 75 microns to produce a
50g charge for fire assay.
Drilling
techniques
• Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
• Drilling at Boomerang is being completed to
industry standard by DDH1 Drilling Pty Ltd
and Topdrill Pty Ltd, operating truck mounted
diamond drilling rigs.
• Diamond drilling produced PQ, HQ and NQ
core
• Core is oriented using a digital IMDEX® ACT
3C orientation system by DDH1 and the Axis
Champ Ori Tool v1 by Topdrill.
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Core recovery was measured for the entirety
of the reported drill holes. Recovery within the
reported mineralised intersections was good,
with no material core-loss interval affecting
the reported intersections identified.
• No quantitative analysis of the relationship
between recovery and grade was reported and
no material bias is considered evident based
on available information.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• The logging is qualitative in nature, with the
entirety of drill holes logged.
• Logging is completed to industry standard.
• Valiant diamond drill holes are all orientated
and have been logged in detail for geology,
veining, alteration, mineralisation and
orientated structure.
• Core has been logged in enough detail to
allow for the relevant mineral resource
estimation techniques to be employed.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 15
Criteria JORC Code explanation Commentary
• Diamond core is photographed both wet and
dry and the photographs are stored on Valiant
Gold Ltd servers.
• Logging is completed in Plexer® software
before being transferred into Micromine® for
subsequent review and validation.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• Diamond core was cut along the core axis,
with half-core samples submitted for analysis.
• Sample intervals are commonly sub-set via
geological features as appropriate.
• QA/QC is currently ensured during the sub-
sampling stages process via the use of the
systems of an independent NATA / ISO
accredited laboratory contractor.
• Samples undergo fine pulverisation of the
entire sample by an LM5 type mill to achieve a
75µ
product prior to splitting.
• Sample sizes are considered appropriate for
the grain size of the mineralisation.
• The un-sampled half of diamond core is
retained for check sampling if required.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
• Valiant Gold reported samples were analysed
by 50g fire assay lead collection and finished
by flame atomic absorption spectrometry at
the Australian Laboratory Services Ltd (ALS)
Perth.
• The method is considered appropriate for the
style of gold mineralisation.
• The assay techniques are considered
appropriate for the style of mineralisation
sampled and resources in question.
• Quality control is ensured via the use of
standards, blanks and duplicates.
• Company QA/QC samples comprised certified
reference materials inserted at approximately
1:20, blanks inserted at approximately 1:25.
ALS also applied its internal laboratory QA/QC
procedures, including certified reference
materials and laboratory repeats.
• QA/QC results for the batches supporting this
announcement were reviewed before release.
No material failures affecting the reported
results have arisen in the reported drill results.
• Details for historical results at Boomerang are
reported in the announcement dated 16 July
2026.
Verification of
sampling and
assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Significant intersections are checked by
the Database Geologist and the Exploration
Manager. Significant intersections are
cross-checked with the geology logged
after final assays are received.
• No twin holes have been drilled for
comparative purposes.
• Primary sampling data was collected on paper
logs
and entered via a field laptop computer using
Plexer® software by the field team and is
reviewed by the supervising geologist.
• All drilling data are stored in an Azure SQL
database with in-built validation checks.
ASX ANNOUNCEMENT – FIRST BOOMERANG DRILLING RESULTS RETURN MULTIPLE HIGH-GRADE GOLD INTERCEPTS
28 OCTOBER 2026
pg. 16
Criteria JORC Code explanation Commentary
Supporting information is retained on the
company server.
• No modifications have been made to the
assay data received.
Location of data
points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Valiant Gold diamond drilling released in this
announcement has been picked up using a
Trimble DA2 Catalyst GNSS Receiver with a +/-
0.6m error.
• Downhole survey measurements used an Axis
Gyro with measurements recorded
Share your feedback
Discover